Apartment Renovation in Dubai

Full and partial apartment renovations, planned around your building's rules and delivered on a programme you agree before work starts.

logo Certified Renovation Company

    Apartment living room with a projector screen, sofa and leather armchair

    What our apartment renovation in Dubai includes

    REDO handles apartment renovation in Dubai at any scale, from one bathroom to a full refurbishment of the flat. Apartments come with rules a villa doesn't have: building management approval, fixed working hours, lifts and loading bays to book, and neighbours above, below and next door. We plan around all of that from the first visit, so the works start when they should and don't stall halfway over a missing approval. Depending on scope, most apartment renovations take 2 weeks–3 months. You get a written estimate and a programme before anything starts.

    Complete apartment renovation

    The whole apartment, from concept to handover: kitchen and bathroom remodelling, space planning, flooring and tiling, painting, lighting and electrical work, plumbing and AC, and custom cabinetry. We plan it as one job, so the trades follow each other in a sensible order and the finishes match from room to room.

    Partial renovation

    One part of the apartment: a kitchen or a bathroom, new flooring, a feature wall or new lighting. A partial job is often the right call when the layout works and only the finishes have aged.

    Interior design

    Colour palettes, furniture selection, soft furnishings, art and accessories. Useful when you want the apartment to feel finished on the day you move back in, not months later.

    Renovating to rent or sell

    For owners preparing a unit to let or sell, we concentrate on what tenants and buyers see first: the kitchen, the bathrooms, the floors and the walls. We pick finishes that stand up to regular use and are simple to maintain.

    How an apartment renovation works

    1. First call or WhatsApp. Tell us about the apartment and what you want to change.
    2. Survey and brief. We visit, measure, check the services and note the building's rules on works and access.
    3. Design and estimate. You get a design direction and a written estimate with a programme.
    4. Approvals. We prepare the documents for the building management and, where the work needs it, the authorities.
    5. Works and handover. We work within the building's permitted hours, keep you updated and hand over the finished apartment.

    Living in it, or renovating it empty

    An empty apartment is quicker to renovate. We can work in every room at once, and there is no furniture to protect or kitchen to keep running. If you are living there during the works, we phase them so you keep a working bathroom and somewhere to sleep, and we agree the order of rooms with you before we start.

    Some combinations are hard to live through. When the kitchen and the bathrooms are being redone at the same time, most people move out for the main phase and come back for the finishing work. At the survey we tell you which option suits your scope.

    Living room with a slatted wood TV wall, backlit shelving and a grey sofa

    Approvals for apartment renovation in Dubai

    Apartments are in jointly owned buildings, so the building has a say in what you do. In a jointly owned building, changes to the structure, the outside appearance or the common parts need the approval of the master developer, the Dubai Land Department and the competent authority. Your building's management company also sets rules for works, contractor access and working hours.

    Changes to your electrical installation need DEWA's prior approval.

    Not everything needs a permit. Small cosmetic jobs, such as painting or changing light fittings, usually need no permit. Work that changes walls, ceilings, partitions, flooring in larger units, electrics or plumbing needs approval before it starts.

    We prepare the documents with you and add the approval stage to the programme. Our guide to building NOCs and permits explains each step.

    Bedroom with floor-to-ceiling windows and a balcony overlooking Dubai Marina at sunset

    What affects the cost of an apartment renovation

    We don't publish prices, because two apartments with the same floor plan can need very different work. The cost depends on:

    • the size of the apartment and how many rooms you renovate
    • whether you change the layout or keep it
    • the finishes, fittings and cabinetry you choose
    • the condition of the plumbing, electrics and AC
    • the building's rules on working hours and access

    The first two usually make the biggest difference. Moving a kitchen or a bathroom means new plumbing routes and more approvals, while keeping the layout and changing the finishes is simpler. After the survey you get a written estimate. For more detail, read how renovation costs are worked out.

    How long an apartment renovation takes

    Apartment renovations take 2 weeks–3 months. Where your project lands in that range depends on how much changes, how long the approvals take, and whether the materials you choose are in stock. On its own, a kitchen renovation takes 2–6 weeks and a bathroom renovation takes 1–3 weeks. A refresh with paint, flooring and lighting sits at the short end. A full renovation with layout changes sits at the long end. Your programme comes with the estimate and shows the approval stage separately.

    Why REDO for your apartment renovation

    Licensed in Dubai

    REDO's trade licence is DET 751468. You can verify it on the Dubai Department of Economy and Tourism licence search.

    Building rules planned in

    Approvals, access and working hours are part of the plan before the works start, so they don't catch anyone out later.

    Experience

    10+ years in Dubai, 150+ residential projects and a team of 100+.

    Led by Andrew Meyer

    Andrew Meyer, our Head of Projects, heads the company.

    Warranty

    You get a 1-year warranty on key installations.

    Years Experience
    10+
    Residential Projects
    150+
    Commercial Projects
    50+
    Team Members
    100+

    Client Testimonial

    Our Partners

    Areas we serve

    We renovate apartments across Dubai, including Downtown Dubai, Dubai Marina, Palm Jumeirah, Dubai Hills Estate, Business Bay and JVC.

    Frequently asked questions

    How much does apartment renovation cost in Dubai?

    It depends on the size of the apartment, the rooms you renovate and the finishes you choose. Layout changes cost more than cosmetic upgrades. We don't publish prices. You get a written estimate after the survey.

    How long does apartment renovation take?

    Most apartment renovations take 2 weeks–3 months. The exact time depends on how much work there is, the approvals and whether the materials are available.

    Do I need building management approval to renovate my apartment?

    For most renovations, yes. The building's management company sets rules for works, contractor access and working hours. Changes to the structure, the façade or the common parts need approval from the master developer, the Dubai Land Department and the competent authority as well.

    Do I need DEWA approval for electrical work?

    Changes to your electrical installation need DEWA's prior approval. When the scope includes electrical changes, we add this to the approvals plan.

    Can I live in my apartment during the renovation?

    For partial work, often yes. For a full renovation, most people move out for the main phase. We tell you at the survey what is realistic for your scope.

    Can you manage the renovation if I'm not in Dubai?

    Yes. You get regular progress updates with photos on WhatsApp.

    What's the difference between post-handover fit-out and full renovation?

    A post-handover fit-out customises a newly handed-over apartment that nobody has lived in yet. A full renovation updates or replaces the existing finishes, fixtures and layouts in an occupied or older apartment.

    Does the location of the apartment affect the cost?

    It can, through logistics, approval requirements and contractor access. The scope of work and the materials you choose usually matter more.

    Is it worth renovating an apartment before renting it out?

    A refreshed kitchen, bathroom and floors can make a unit easier to let. We help you choose finishes that suit a rental: hard-wearing and simple to maintain.

    Do you help with furniture and decor?

    Yes. Our interior design service covers colour palettes, furniture selection, soft furnishings and accessories.

    The REDO team in front of a villa in Dubai
    fluent chat 48 regular

    Renovate your apartment

    Tell us about your apartment and your building. We'll survey it and send you a written estimate with a programme.

      WhatsApp